A website project has a lot of moving parts: planning, copy, photos, design, development, SEO and testing. When one part slips, everything behind it slips too. A clear timeline keeps everyone on track and helps you plan your own time, which matters because a small business owner usually has the most work to do outside the project itself.
This article lays out a realistic eight week timeline for a typical small business website of about 8 to 15 pages, including what the web team does and what you need to deliver each week.

Before Week One: Get Ready
The projects that launch on time usually start with preparation:
- Goals: what should the website achieve? More calls, quote requests, bookings or sales?
- Access: logins for your domain registrar, current hosting, Google Business Profile and analytics
- Brand assets: logo files, colors, fonts, any brand guidelines
- Examples: two or three websites you like and why
- Decision maker: one person who gives final approval
If you have this ready, week one can focus on strategy instead of chasing files.
Week 1: Discovery and Sitemap
Web team: kickoff call, review of your current site and competitors, keyword research, sitemap and page plan.
You: answer questions about customers, services and what sets you apart. Approve the sitemap.
Output: a list of pages and what each one needs to do.
Week 2: Wireframes and Content Plan
Web team: wireframes for key pages showing layout and content order. A content brief for each page.
You: start writing or reviewing copy. Collect photos of your team, work and location.
Output: approved layouts and a content plan with deadlines.
Week 3: Visual Design
Web team: home page design and one inner page design, applied to your brand, for desktop and mobile.
You: give consolidated feedback within two or three days.
Output: first design round.
Week 4: Design Revisions and Final Content
Web team: revisions to the designs and remaining page templates.
You: deliver final copy and images for every page.
Output: approved designs and all content ready. This is the most important handoff in the project. If content is late, development stalls.
Week 5: Development
Web team: build page templates, set up the content management system, create forms and connect integrations.
You: small questions only. Prepare your list of team members who need logins.
Output: working pages on a staging site.
Week 6: Content Entry and SEO Setup
Web team: add content to every page, compress images, set page titles and meta descriptions, add schema markup, prepare redirects if replacing an old site.
You: review pages on the staging site.
Output: a near complete site.
Week 7: Testing and Fixes
Web team: test on phones, tablets and desktop browsers. Test every form. Check speed. Fix issues.
You: final review and sign off.
Output: a site ready to launch.
Week 8: Launch and Training
Web team: go live, connect the domain, check redirects, submit the sitemap in Google Search Console, set up analytics and conversion tracking.
You: attend a short training session on editing pages and checking leads.
Output: a live website and a team that knows how to use it.
What Can Shorten or Lengthen the Timeline
| Factor | Effect |
|---|---|
| Content ready before kickoff | Can save 1 to 2 weeks |
| Template based design | Can save 1 to 2 weeks |
| Many unique page layouts | Adds 1 to 3 weeks |
| Booking, payments or integrations | Adds 1 to 4 weeks |
| Platform migration or many old URLs | Adds 1 to 3 weeks |
| Slow feedback | Adds whatever the delay is, often more |
For shorter and longer project types, see how long does it take to build a website.
Tips for Staying on Schedule
- Put review dates in your calendar on day one.
- Batch feedback from your team into one document.
- Write copy in plain language and do not aim for perfect. Pages can be improved after launch.
- Keep a parking lot list for ideas that can wait until phase two.
- Ask for a shared project board so you can see what is waiting on whom.
After Launch: The First 30 Days
Launch is not the end. In the first month:
- Watch Search Console for crawl errors and redirect issues
- Check that forms and calls are being tracked
- Fix small issues as real visitors use the site
- Ask happy customers for Google reviews
- Plan your first blog posts or new service pages
Our SEO for new websites guide covers the first 90 days in detail.
Example: A Shared Project Board
Many teams track the timeline on a simple shared board. Here is what one might look like in week four for a fictional chiropractic clinic:
| Task | Owner | Due | Status |
|---|---|---|---|
| Approve home page design | Clinic owner | Mon | Done |
| Final copy for 5 service pages | Clinic owner | Wed | In progress |
| Team photos | Clinic manager | Wed | Waiting |
| Inner page templates | Designer | Thu | In progress |
| Booking tool access | Clinic manager | Fri | Not started |
| Development start | Developer | Next Mon | Blocked by copy |
At a glance, everyone can see that development depends on the clinic's copy. The owner knows exactly what to prioritize this week.
What Each Side Is Responsible For
| Business | Web team |
|---|---|
| Goals and decisions | Plan and process |
| Content and photos, unless included | Design and development |
| Timely feedback | Clear options and explanations |
| Logins and access | Testing and quality checks |
| Final approval | Launch, training and handover |
Projects run smoothly when both sides know their part from the start.
Common Timeline Mistakes for Small Businesses
Not blocking time for the project. Owners are busy. Put review sessions and writing time in your calendar as real appointments.
Waiting for perfect photos. Launch with good, real photos and replace them later if needed.
Leaving legal pages to the end. Privacy policies and disclaimers can take time. Start them early.
Forgetting about email during launch. If the domain moves, email settings must be copied correctly. Ask your web team to check.
Skipping the training session. A short walkthrough saves hours of confusion later.
A Week by Week Checklist for Business Owners
- Week 1: share goals, logins, brand files and examples
- Week 2: approve sitemap, start writing copy
- Week 3: review designs, send consolidated feedback
- Week 4: deliver final copy and photos
- Week 5: answer development questions
- Week 6: review the staging site
- Week 7: final approval
- Week 8: launch, training, start collecting reviews
Print this list or add it to your calendar at kickoff. It turns a vague project into a clear set of small tasks.
Planning for Busy Seasons
If your business has a peak season, such as tax season for accountants or spring for landscapers, plan the launch at least four to six weeks before it. That leaves time to fix issues and for Google to start indexing new pages before customers start searching.
Start Your Project With a Clear Plan
Every Code Staff Hub project starts with a written timeline and clear responsibilities on both sides. Get your free quote and project plan or browse our website design services.
Frequently Asked Questions
How long should a small business website project take?
About 6 to 8 weeks is realistic for a site of 8 to 15 pages with custom design. Simpler sites can launch in 3 to 4 weeks.
What do I need to prepare before a website project?
Your goals, logo and brand files, logins for domain and hosting, examples of sites you like, and ideally a first draft of your page content.
Who is responsible for website content?
It depends on your agreement. Many projects expect the business to provide content, while some packages include copywriting. Clarify this before the project starts.
What happens if the timeline slips?
Most delays come from late content or feedback. A good provider will flag delays early and adjust the plan. Scope changes may also change the price.